Уведомление об обновлениях схем
| Change Notification # |
|
10863 |
| Revision |
|
|
| Type of Notification |
|
INITIAL PRODUCT/PROCESS CHANGE NOTIFICATION |
| Change Title |
|
Initial Notification for Bipolar Power Wafer Fab Transfer from Toulouse, France to Phoenix, Arizona |
| Issue Date |
|
2001-03-13 |
| Affected Product Family |
|
DISCRETES |
| Description |
|
Initial Notification, 120 Days prior to the change will be followed by appropriate Final Process Change Notices with supporting data a minimum of 60 days prior to implementation.
ON Semiconductor wishes to notify its Customers that the Bipolar Power Wafer Manufacturing Operation located in Toulouse-France will be transferred to Phoenix, Arizona. At the same time, the wafer diameter will be changed from 125mm to 150mm. The entire Wafer manufacturing transfer and qualification process will be done in 4 major phases, each phase corresponding to the qualification of all devices using a specific major Bipolar Power Technology.
1st phase, all Product Lines built with the Epi Base Technology will be qualified and transferred.
2nd phase, all Product Lines using the Power Base Technology will be qualified and transferred.
3rd phase, all Product Lines built with the Low Voltage Planar Technology will be qualified and transferred.
4th phase, all Product Lines built with the High Voltage SIPOS Planar Technology will be qualified and transferred.
|
| Key Items Affected by Change |
|
Fab Site |
| |
| Key Milestones |
|
| Effective Date: |
|
2001-06-28 |
| Sample Info: |
|
None |
| Possible Replacements |
|
N/A |
For more information on this Process Change Notification, please
contact your local ON Semiconductor sales office.
|
|